March 25th, 2012

second year, study period 2, architecture, design communication 

second year, study period 2, architecture, design studio 3

Architecture! (i made it)

Study Period 5 Design Construction housing C 
Study Period 5  Interior Architecture Studies C
Study Period 5  Interior Architecture Studio 2 C
Study Period 5 Material and Processes 1 D
Study Period 2 Design Construction Principles HD
Study Period 2 Design Studio 1 D
Study Period 2 Drawing and Representation  D

Made it into Architecture with a GPA of 5.66! :) 

C+

project 225% although this was not my final project for Studio 2. i believe this was my best work for Studio. we were to develop our ideas from our first project to produce our final. my inspiration from the first project was spiders and webs which later became spider man. 

C+

project 2
25% 

although this was not my final project for Studio 2. i believe this was my best work for Studio. we were to develop our ideas from our first project to produce our final. my inspiration from the first project was spiders and webs which later became spider man. 

C

this concept was developed from the inspiration of spider-man. my idea of this was exposing and clustered frame work that represents webs. 
once again, not my greatest work for my final submission for first year.

C

this concept was developed from the inspiration of spider-man. my idea of this was exposing and clustered frame work that represents webs. 

once again, not my greatest work for my final submission for first year.

first year, study period 5, interior architect, design studio 2

C
by the time i got to my finals at the end of my first year i kinda gave up and did everything very last minute because i picked up more hours from work. i had difficulties with this project due to the amount of calculations involved. this submission was backed up with drawings but as everything was last minute it was very crappy and i didnt bother keeping a copy. 

C


by the time i got to my finals at the end of my first year i kinda gave up and did everything very last minute because i picked up more hours from work. i had difficulties with this project due to the amount of calculations involved. this submission was backed up with drawings but as everything was last minute it was very crappy and i didnt bother keeping a copy. 

first year, study period 5, interior architect, design construction housing.

June 16th, 2011
 
HD+
12 hours of construction. 2 mock up models. 
finally finished my design construction! its a bus shelter :) if u haven’t figured out what it was.
due date: 8th june worth: 60% (40% model work 20% technical drawing) 

HD+

12 hours of construction. 2 mock up models. 

finally finished my design construction! its a bus shelter :) if u haven’t figured out what it was.

due date: 8th june 
worth: 60% (40% model work 20% technical drawing) 

first year, study period 2, interior architect, design construction principles.